Space Travel News  
NASA To Realign Constellation Program Milestones

NASA will retire the space shuttles in 2010 and had established a goal of achieving flight capability for the Constellation Program before 2015 to narrow the gap in America's human spaceflight capability.
by Staff Writers
Washington DC (SPX) Aug 12, 2008
In a news conference Monday, NASA managers discussed how the agency will be adjusting the budget, schedule and technical performance milestones for its Constellation Program to ensure the first crewed flight of the Ares I rocket and Orion crew capsule in March 2015.

The Constellation Program is developing the spacecraft and systems, including the Ares I and Ares V rockets, the Orion crew exploration vehicle, and the Altair lunar lander, that will take astronauts to the International Space Station after the retirement of the space shuttle, and eventually return humans to the moon.

"Since the program's inception, NASA has been working an aggressive plan to achieve flight capability before our March 2015 target," said Rick Gilbrech, associate administrator for the Exploration Systems Mission Directorate at NASA Headquarters in Washington.

"We are still confident the Constellation Program will make its first flight to the International Space Station on or before that date. Our new path forward better aligns our project schedules with our existing funds to ensure we can address the unplanned challenges that always arise when developing a complex flight system."

NASA will retire the space shuttles in 2010 and had established a goal of achieving flight capability for the Constellation Program before 2015 to narrow the gap in America's human spaceflight capability. As such, NASA aligned Constellation contracts and internal milestones against a date much earlier than March 2015 to incentivize an earlier flight capability.

As part of an annual budget process that evaluates the program's budget, schedule and technical performance milestones, NASA will be working with its contractors to discuss how program plans and internal milestones should be adjusted -- a process that will take several months and require contract modifications and associated milestone realignments.

Such adjustments are not unusual for a complex development program as work matures and schedules and resources are aligned.

Related Links
Constellation Program
Space Tourism, Space Transport and Space Exploration News



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


OSU Students Build And Launch A Sensor Into Space
Stillwater OK (SPX) Aug 12, 2008
Students from OSU's Radiation Physics Laboratory built and successfully launched a cosmic radiation detector this summer that reached the edge of outer space. Carried by a helium-filled balloon 12 inches in diameter, the detector flew for more than two hours and reached 104,000 feet in altitude.







  • Star Trek-like 'warp drive' theorized
  • Falcon 1 Flight 3 Mission Summary
  • Rocket Racing League Conducts Rocket Racer Flights
  • Boeing Team To Design New Spacecraft Power Generation System

  • AFSPC Announces Commercial Space Launch Proposal
  • Soyuz glitch remains a mystery: NASA chief
  • Russian Launch Of Satellite On Converted Satan ICBM Postponed
  • Russia Puts Off Launch Of Inmarsat Satellite Until August 19

  • LockMart External Tank Is Pacing Item For Hubble Space Telescope Launch
  • LockMart Announces Workforce Reductions On Shuttle External Tank Program
  • External Tank ET-128 Sets New Standard During Recent Shuttle Mission
  • NASA Sets Launch Dates For Remaining Space Shuttle Missions

  • ISS Crew Inspired By Vision And Dreams Of Jules Verne
  • Space Station A Test-Bed For Future Space Exploration
  • Space chiefs ponder ISS transport problem, post-2015 future
  • Two Russian cosmonauts begin new space walk

  • NASA To Realign Constellation Program Milestones
  • NASA is given a thumbs-up in safety report
  • OSU Students Build And Launch A Sensor Into Space
  • Four Indian Students On NASA Tour Go Missing In US

  • China's Space Ambitions
  • Rocket For China's Manned Space Mission At Launch Center
  • China To Release 700 Hours Of Chang'e-1 Data
  • China Aims For World-Class Space Industry In Seven Years

  • Japanese Researchers Eye e-Skin For Robots
  • Robots may enhance disabled people's lives
  • Robo-relationships are virtually assured: British experts
  • Europe And Japan Join Forces To Map Out Future Of Intelligent Robots

  • Preparation Begins For New European Space Mission To Mars
  • ROTOZIP Duracut Bit Helps Phoenix Collect Martian Soil Samples
  • Opportunity Fights Uphill Battle
  • Professor Plays Vital Role In Mars Water Breakthrough

  • The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement