Space Travel News  
Parallel Launch Campaigns For Next Two Ariane 5s

TerreStar-1 being mated to the cone-shaped adapter unit.
by Staff Writers
Paris, France (SPX) Jun 25, 2009
Two Ariane 5 launch campaigns are in full swing at the Spaceport, keeping Arianespace on track for its targeted seven missions in 2009 with the workhorse heavy-lift vehicle.

For its third flight of the year, the TerreStar-1 telecommunications satellite has made initial contact with Ariane 5 hardware, with the very large spacecraft being mated to the cone-shaped adapter unit that will serve as its interface with the Ariane 5 ECA.

This activity occurred in the S5A hall of the Spaceport's S5 payload preparation facility, where TerreStar-1 was loaded with its onboard propellant last week.

The next step will be TerreStar-1's transfer to the Ariane 5 Final Assembly Building, where it will be installed atop the heavy-lift launcher as a solo payload for the July 1 mission.

TerreStar-1 is a Space Systems/Loral-built spacecraft, and will be utilized by TerreStar Networks to deliver voice, data and video communications to satellite/terrestrial mobile devices the size of a typical smart phone. Operating in the 2 GHz spectrum, TerreStar-1 is designed for coverage of the United States and Canada - offering services for government, emergency responders, rural communities and commercial users.

In parallel, the fourth heavy-lift Ariane 5 ECA for launch in 2009 has completed its initial build-up at the Spaceport. Industrial prime contractor EADS Astrium achieved the assembly milestone inside the Spaceport's Launcher Integration Building when it topped off the vehicle with Ariane 5's upper composite - which consists of the ESC-A cryogenic upper stage and equipment bay.

Using a streamlined build-up process for Ariane 5, the ESC-A cryogenic upper stage and equipment bay are installed as a single unit - having been integrated and checked out in Europe by EADS Astrium, then shipped to the Spaceport. In the prior procedure, Ariane 5's upper stage and vehicle equipment bay were installed on the launcher in two steps at the Spaceport, which required additional time and validation procedures.

Additional systems integration and check-out are now underway with the Ariane 5 to ready it for transfer to the Spaceport's Final Integration Building. This step will mark Astrium's delivery of the Ariane 5 ECA to Arianespace, which takes over for the installation of the mission's dual-satellite payload and the launch operations.

Share This Article With Planet Earth
del.icio.usdel.icio.us DiggDigg RedditReddit
YahooMyWebYahooMyWeb GoogleGoogle FacebookFacebook



Related Links
Arianespace
Launch Pad at Space-Travel.com



Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News


Arianespace To Launch ST-2 For Singapore And Taiwan
Paris, France (SPX) Jun 19, 2009
ST-2 Satellite Ventures Pte Ltd (STS), a joint venture formed by Singapore Telecommunications Ltd (SingTel) and Chunghwa Telecom Company Ltd (Chunghwa), has chosen Arianespace to launch its new telecommunications satellite, ST-2. This satellite will replace ST-1 launched by Arianespace in 1998. ST-2 will be launched by an Ariane 5 ECA during the second quarter of 2011 from the Guiana Space ... read more







The content herein, unless otherwise known to be public domain, are Copyright 1995-2009 - SpaceDaily. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement,agreement or approval of any opinions, statements or information provided by SpaceDaily on any Web page published or hosted by SpaceDaily. Privacy Statement