Subscribe free to our newsletters via your
. Space Travel News .




SPACE TRAVEL
Sierra Nevada Completes Major Dream Chaser NASA CCiCap Milestone
by Staff Writers
Sparks NV (SPX) Jul 25, 2014


SNC former astronaut Lee Archambault prepares for Dream Chaser Crew Systems Test.

Sierra Nevada has announced it has successfully passed Milestone 9, the Risk Reduction and Technology Readiness Level (TRL) Advancement Testing milestone, for several critical Dream Chaser systems under NASA's Commercial Crew Integrated Capability (CCiCap) agreement. Milestone 9 culminated in a major comprehensive review of various hardware systems. To date, SNC has received 92 percent of the total award value of the CCiCap agreement.

As defined in the Milestone 9 criteria, SNC completed a series of Risk Reduction and TRL advancements on five major systems on the technologically advanced, Dream Chaser spacecraft lifting-body design. The five specific systems subjected to extensive testing were: Crew Systems, Environmental Control and Life Support Systems (ECLSS), Structures, Thermal Control (TCS) and Thermal Protection Systems (TPS).

The comprehensive set of tests were in addition to the Risk Reduction and TRL advancement tests completed on the Main Propulsion System and Reaction Control System as part of the recently, and successfully, completed CCiCap Milestone 9a, as announced in SNC's press release of July 8, 2014.

The data collected from the more than 3,500 tests completed over a year during these two milestones resulted in continued maturation of the Dream Chaser spacecraft design and significantly retired overall program risk.

With the successful completion of Milestones 9 and 9a, SNC has continued to demonstrate, through rigorous testing, that it puts safety first as the team refines the highly capable spacecraft design that will ferry people to and from low-Earth orbit (LEO).

"By thoroughly assessing and mitigating each of the previously identified design risks, SNC is continuing to prove that Dream Chaser is a safe, robust, and reliable spacecraft," said Mark N. Sirangelo, corporate vice president of SNC's Space Systems.

"These crucial validations are vital steps in our Critical Design Review and in showing that we have a very advanced and capable spacecraft. This will allow us to quickly and confidently move forward in restoring cutting-edge transportation to low-Earth orbit from the U.S."

The comprehensive Milestone 9 systems tests that were conducted included:

+ TPS: Extensive design qualification testing was conducted at NASA's Ames Research Center in California and NASA's Langley Research Center in Virginia through existing Space Act Agreements to validate TPS design performance. This effort included over 350 tests that allowed SNC to select the optimal TPS architecture for Dream Chaser to safely fly through the high-heat-load atmospheric environment during nominal return to Earth as well as during high altitude ascent aborts.

+ Structures: Numerous tests were conducted in collaboration with SNC Dream Team member Lockheed Martin at NASA's Michoud Assembly Facility in Louisiana. More than 1,500 stress tests were executed on the primary structure to fully validate the strength and reliability of the Dream Chaser advanced composite structure.

+ Crew Systems: Multiple tests were performed at SNC's Space Systems headquarters in Louisville, Colorado. These crew-related assessments included reach and visibility, as well as crew ingress and egress testing in the horizontal and vertical positions, all in the new full-scale Dream Chaser crew cabin mockup. Over 25 tests were conducted totaling more than 90 hours of data.

+ ECLSS: Human-in-the-loop tests were performed to analyze temperatures and metabolic rates for crew as part of an in-orbit simulation at Orbital Technologies Corporation (ORBITEC) of Wisconsin in conjunction with their teammate UTC Aerospace in Connecticut.

+ TCS: Both internal and external active thermal control of the spacecraft was successfully demonstrated through rigorous testing by Orbitec at their facilities.

Collectively, this broad array of rigorous testing exemplifies SNC's commitment to safety, transparency, and technical rigor as part of an overall test-rich spacecraft development strategy. SNC is working with NASA's Commercial Crew Program during the development of the Dream Chaser - a safe, innovative, modern, flexible and highly-capable crew transportation system for the 21st Century.

Dream Chaser provides the only reusable, human-rated, lifting-body spacecraft with a commercial runway landing capability, anywhere in the world. SNC is on the forefront of the commercial human spaceflight industry, offering safe, reliable and cost-effective crew and critical cargo transportation to and from LEO.

.


Related Links
Sierra Nevada
Space Tourism, Space Transport and Space Exploration News






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle




Memory Foam Mattress Review
Newsletters :: SpaceDaily :: SpaceWar :: TerraDaily :: Energy Daily
XML Feeds :: Space News :: Earth News :: War News :: Solar Energy News





SPACE TRAVEL
New Fort Knox: A means to a solar-system-wide economy
Chicago IL (SPX) Jul 24, 2014
Creating an economic zone of influence that encompasses our solar system will be the single most difficult endeavor the human race has ever attempted. The biggest hurdle isn't even the engineering; it's not that we don't dream big enough and it has little to do with national governments ... it's that we simply cannot comprehend the economics. Let's put it another way: we will not achieve t ... read more


SPACE TRAVEL
SpaceX Soft Lands Falcon 9 Rocket First Stage

SpaceX Falcon 9 v1.1 Flights Deemed Successful

ISS 'space truck' launch postponed: Arianespace

45th Space Wing launches 6 second-generation ORBCOMM satellites

SPACE TRAVEL
Scientists release most thorough map yet of Mars

India could return to Mars as early as 2017

Curiosity's images show Earth-like soils on Mars

NASA Rover's Images Show Laser Flash on Martian Rock

SPACE TRAVEL
China's biggest moon challenge: returning to earth

Lunar Pits Could Shelter Astronauts, Reveal Details of How 'Man in the Moon' Formed

Manned mission to Moon scheduled by Roscosmos for 2020-2031

Landsat Looks to the Moon

SPACE TRAVEL
Annual Checkout Makes for Great Pluto Preparation

In exactly one year, NASA's New Horizons probe will reach Pluto

What If Voyager Had Explored Pluto?

The PI's Perspective - Childhood's End

SPACE TRAVEL
Transiting Exoplanet with Longest Known Year

Brown Dwarfs May Wreak Havoc on Orbits of Nearby Planets

NASA Mission To Reap Bonanza of Earth-sized Planets

Friction from Tides Could Help Distant Earths Survive, and Thrive

SPACE TRAVEL
Sierra Nevada Contacts All Six On-Orbit ORBCOMM Generation 2 Satellites

World's Largest Spacecraft Welding Tool Will Build Core Stage of NASA's Space Launch System

Federal auditors say NASA doesn't have funds for big rocket

Aerojet Rocketdyne Tests 1 Newton Thruster for Green Propellant Infusion Mission

SPACE TRAVEL
Lunar rock collisions behind Yutu damage

China's Fast Track To Circumlunar Mission

Chinese moon rover designer shooting for Mars

Yutu designer's bittersweet

SPACE TRAVEL
Comet ISON's Dramatic Final Hours

Space Systems/Loral conducting technology studies for NASA

Computing Paths to Asteroids Helps Find Future Exploration Opportunities

Asteroid Vesta to reshape theories of planet formation




The content herein, unless otherwise known to be public domain, are Copyright 1995-2014 - Space Media Network. All websites are published in Australia and are solely subject to Australian law and governed by Fair Use principals for news reporting and research purposes. AFP, UPI and IANS news wire stories are copyright Agence France-Presse, United Press International and Indo-Asia News Service. ESA news reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space Media Network on any Web page published or hosted by Space Media Network. Privacy Statement All images and articles appearing on Space Media Network have been edited or digitally altered in some way. Any requests to remove copyright material will be acted upon in a timely and appropriate manner. Any attempt to extort money from Space Media Network will be ignored and reported to Australian Law Enforcement Agencies as a potential case of financial fraud involving the use of a telephonic carriage device or postal service.