Space Shuttle Discovery Arrives At Launch Pad
Cape Canaveral FL (SPX) May 05, 2008 After safely reaching its launch pad at NASA's Kennedy Space Center, space shuttle Discovery now awaits its next major milestone for the upcoming STS-124 mission. A launch dress rehearsal, known as the terminal countdown demonstration test, is scheduled to take place at Kennedy from May 6 to 9. Discovery arrived at the pad at 4:25 a.m. EDT Saturday on top of a giant crawler-transporter. The crawler-transporter left Kennedy's Vehicle Assembly Building at 11:47 p.m. Friday, traveling less than 1 mph during the 3.4-mile journey. The shuttle was secured on the launch pad at 6:06 a.m. Saturday. Discovery is targeted to launch May 31 on a 13-day mission to the International Space Station. The shuttle's seven crew members will deliver the Kibo laboratory's large Japanese Pressurized Module, or JPM, and its remote manipulator system to the International Space Station. Three spacewalks will be conducted during the flight. Mark Kelly will command the STS-124 mission. Ken Ham will be the pilot. The mission specialists are Karen Nyberg, Ron Garan, Mike Fossum, Greg Chamitoff and Japan Aerospace Exploration Agency astronaut Akihiko Hoshide. Chamitoff will remain on the station as a resident crew member, replacing station Flight Engineer Garrett Reisman, who will return home on Discovery. The STS-124 astronauts and ground crews will participate in the practice countdown. The terminal countdown demonstration test provides each shuttle crew with an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency training. STS-124 is the 123rd shuttle flight, the 35th flight for Discovery and the 26th flight to the station. Related Links STS-124 mission and crew Shuttle at NASA Watch NASA TV via Space.TV Space Shuttle News at Space-Travel.Com
Discovery's Next Move: Rollout to Pad 39A Cape Canaveral FL (SPX) May 02, 2008 Space shuttle Discovery is set to complete the final leg of its preflight journey May 3, making the 3.4-mile trek from Kennedy Space Center's Vehicle Assembly Building to Launch Pad 39A. Perched atop the mobile launcher platform, the shuttle assembly will roll out to the oceanside launch complex atop the massive crawler-transporter at less than one mile an hour. |
|
The content herein, unless otherwise known to be public domain, are Copyright Space.TV Corporation. AFP and UPI Wire Stories are copyright Agence France-Presse and United Press International. ESA Portal Reports are copyright European Space Agency. All NASA sourced material is public domain. Additional copyrights may apply in whole or part to other bona fide parties. Advertising does not imply endorsement, agreement or approval of any opinions, statements or information provided by Space.TV Corp on any Web page published or hosted by Space.TV Corp. Privacy Statement |